Tuesday, August 3, 2010

CMB July Meeting Summary

Last Tuesday, July 27th, the Creekwood Master Board had their semi-monthly meeting. A short summary of decisions follows:

  • A motion to authorize Pond Professionals to install aeration devices in ponds 7 & 13 was approved with a maximum total cost not to exceed $4,500 including electrical wiring
  • A motion to authorize Blooming to perform a 1-time preventative spraying of the drainage canal behind Westbrook II of recently removed pepper trees was approved for a cost not to exceed $350
  • Any covenant violation in the community is to be reported directly to Argus who will handle enforcement (the sub associations are no longer involved in verification)
Some items still in process include obtaining bids for the following:
  • Lighting behind the Lakeside wall at recreation area parking lot
  • Drainage ditch clearing and restoration in Lakeside II of pepper trees and Creekside (Due to the time sensitivity of the issue, a special meeting will be called when all bids are available)
  • Video surveillance equipment for the recreation area
  • Lighting for the Lakeside sign on the North side of 49th Ave.
  • Landscaping for the Creekside sign and Lakeside I & II on Creekwood Blvd next to the vinyl fencing

No comments: